Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Frank Mentioned Structured Drilling In Interview

Frank Mentioned Structured Drilling In Interview

posted on Mar 24, 2010 09:10AM

I read a comment on Stockhouse this morning and there was a phrase mentioned structured drilling and I remember in one of Frank's interviews, I believe the last one mentioned here on Agoracom.

Where Frank said I believe, that when they first started drilling Phase 1 and 2 they were looking for structure.

Drilling Structure... drilling done specifically to obtain detailed information delineating the location of folds, domes, faults, and other substructure features indiscernible by studying strata exposed at the surface.

From the old mine reports, the miners sunk shafts and mined the high grade gold found in quartz veins and the old tailings had 1.6 grams a ton. GBB first land position was 7 klm's long and recently increase to 14 klm's. I believe the visible structure at surface is originally why GBB staked the ground and did the bulk sample, which had poured its first gold bar in the news release August 25, 2006. Something like 8 kilogram bar. Check out the release.

GBB land position obvisiously is on fault zones, volcanic formations and a host of other geological formations that look quite promising.

We may not see news this week until the pp is announced and as BMR mentioned people exercising their warrants from last fall. I believe around .07 cents and .10 cents

As Centerion mentioned in a post yesterday from a technical point of view and quite accurately, we could see a slight pull back.

Like a old Kenny Roger's song...."you got to know when to hold'em"

Share
New Message
Please login to post a reply