Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Interview repost

Interview repost

posted on Mar 27, 2010 12:10PM

Was so good I had to repost

http://www.smartstox.com/interviews/gbb/

Share
New Message
Please login to post a reply