Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: BMR Musings From Rouyn-Noranda

Frank also said that a third drill is to be ordered for deeper drilling. I don't know when but as BMR said, he is true to his word. So far this appears to be a two pronged attack with the infill drilling for the 43 101 compliance. The third prong of the attack will be for depth.

Hang on and enjoy.

Don

Share
New Message
Please login to post a reply