Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Where ....

i think mintaka got it, nothing much new to talk about at the moment, low volume today too, guess that could for several reasons, wondering if everyone that wants in is basically locked and loaded finally and awaiting results,, i see that bmr made quite a bold statement with reputation on the line, i guess nothing is for sure in the market but i have never felt as positive about a company and project in my short time trading. i think there are several hints and "read between the lines here" in nr's and bmr's reports. i have a feeling for what its worth that the 2.4-2.6 could look pretty silly here in a year or two..

Share
New Message
Please login to post a reply