Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: New on GBB website - 68.3 m of 2.16 g/t

New updates within the presentation and fact sheets on the website

GR-10-53 intersected 68.3 metres of 2.16 g/t
Au within a wider near-surface interval of 110.5 metres
(3.5 metres to 114 metres) grading 1.34 g/t Au as reported
in GBB's September 9 news release. The hole was drilled
perpendicular to Vein #2 and is believed to closely
approximate true width"

http://goldbulliondevelopmentcorp.com/html-pages/index.phtml

Share
New Message
Please login to post a reply