Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Gold Bullion Development (GBB, TSX-V)

yup i agree rockstar,,,there is a slight chance that we might see something way above the average grade in the east,,,that would be a nice bonus,,but like you say anything 2 grams or over over 200 meters would be incredible as well,,,,,right now the sp is not moving the way it should,,,,i would say that nothing has changed here but it has,,,every nr is better and better,,the market will catch up eventually,,,meanwhile people are stealing shares at these levels i think,,,,,also it will be interesting when they get over to the old mine in phase three where grab samples reported 7 ounces per tonne,,,,that would be something to hit a hole or two like that,,,,

i guess the point i would like to drive home is that yes it would be nice to hit a couple higher grade holes say around hole 86,,,but even if we dont long term things will still be looking bright for gbb,,,,

Share
New Message
Please login to post a reply