Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Response posted by Pleckaitis on the other forum. Thank you..:)

That was you fguide? Good call. There is only one way for them to get over the low 54 cent pp deal. With news. If they can now put out some good holes all would be forgotten.

We knew it was coming anyway. When the sp began moving up yesterday and the day before I thought something like this was up.

As you and rockstar have said we need the money for phase 3 and since they are not stopping in order to keep the rigs on site, I can only surmise that the big boys have seen something worth following up. Frank is in a hurry I must say.

Anyway good call. The way the pp is written up tells me that they are being very generous to the insiders who as they say may be participating in the pp.

Don

Share
New Message
Please login to post a reply