Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Key Points from SmartStox Interview

Another good interview from Frank. This is on the back of two on Jay Taylor's show and one this coming week on Bull Market Run. A couple of things I learned from this interview that I took away:

1.) Other than a short break for the Christmas holiday for a field crew that is working 24/7, they will continue to drill around the clock and regardless of season of the year.

2.) Road construction should be done to future drill sites by the end of this year or early next year.

3.) Frank thinks that in the next 12 to 18 months that there will be 100,000 meters of drilling. This would seem to me that a so called future Phase 4 drill program would have to be at least a bit larger than the current 50,000 meter Phase 3 drill program that began this fall.

4.) All drilling now in terms of exploration is going to the east and north-east.

5.) The structure seems to be open in all directions as well as at depth.

6.) There is on average one historic high grade mine for each Km of strike length on their property trend. These mines were mined in the 1920's, 30's, and so on.

7.) There is no real overbuden to the deposit. Ideal for an open pit mine. Bedrock is at surface or within 3 meters of the surface.

8.) Investors in the company now include some from the Middle East. Volume on shares have averaged about 1 million shares.

Disclaimer 1: I am an investor in the company.

Disclaimer 2: The above is from my memory and notes from the interview. Readers are encouraged to listen to this and previous interviews on their own.

Share
New Message
Please login to post a reply