Gold Bullion drills 72.25 m of 1.25 g/t Au
posted on
Apr 05, 2011 06:21PM
So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.
Mr. Frank Basa reports GOLD BULLION REPORTS 1.25 G/T AU OVER 72.25 METRES AT GRANADA Gold Bullion Development Corp. has released additional drill results from its Granada property, located along the Cadillac trend in northwestern Quebec, five kilometres south of the city of Rouyn-Noranda. Gold Bullion has now completed 20,000m of the planned 50,000m Phase 3 drill campaign. A total of 67,730m have been completed since the first hole was collared in December 2009. Highlights of the most recent assay results include: The continually-expanding mineralized area remains open in all directions and at depth. The mineralized zone now covers an area of 1.2 kilometres along strike and is up to 0.5 kilometres wide. Mineralization of known historical mine workings extends to a depth of 300 metres. Drilling at the Granada Property continues with 2 drill rigs. Five holes (GR-10-91, GR-10-149, GR-10-194, GR-11-228 and GR-11-234) did not intersect significant mineralization and are therefore not included in the above table. Widths reported in the preceding table are drill widths; true widths are unknown at this time. Assays are uncut, length-weighted average values. Lost core within mineralized intersections were incorporated as blank intervals and assigned a 0.0 g/t grade in all length-weighted calculations Gold Bullion's NQ drill program and drill core sampling, including the quality assurance/quality control program, are supervised by GENIVAR, Gold Bullion's geological consultant. Core from the above holes was sent to ALS Chemex Labs in Val d'Or, Quebec, and Accurassay Laboratory in Timmins, Ontario, for analysis. Gold was assayed by fire assay with additional metallics analysis done on samples where visible gold was identified. Analytical accuracy and precision are monitored by the analysis of reagent blanks and reference materials at both labs. Quality control is further assured by the insertion of blind certified standard reference material and blanks into the sample stream at regular intervals by Gold Bullion and GENIVAR personnel in order to independently assess analytical accuracy. We seek Safe Harbor.Hole GR-10-97 65.14 metres grading 0.99 grams per tonne
Including 0.88 metres grading 57.00 grams per tonne
Hole GR-10-179 72.25 metres grading 1.25 grams per tonne
Including 1.50 metres grading 29.30 grams per tonne
Hole From To Length Weighted Au g/tonne
GR-10-69 3.00 180.00 177.00 0.42
including 87.23 171.00 83.77 0.69
including 135.00 171.00 36.00 1.32
including 141.00 144.00 3.00 8.60
and including 169.70 171.00 1.30 6.05
GR-10-80 3.50 52.70 49.20 0.31
including 3.50 25.20 21.70 0.46
GR-10-88 39.00 47.35 8.35 0.74
GR-10-97 1.80 144.00 142.20 0.61
including 6.30 53.00 46.70 1.51
including 6.30 10.00 3.70 3.32
and including 29.36 94.50 65.14 0.99
including 29.36 53.00 23.64 2.40
including 29.36 30.24 0.88 57.00
GR-10-109 154.50 196.10 41.60 0.36
and 188.90 204.92 16.02 0.70
GR-10-111 102.00 147.00 45.00 0.33
including 125.64 147.00 21.36 0.47
including 145.50 147.00 1.50 6.46
GR-10-122 83.47 126.50 43.03 0.37
including 91.00 107.81 16.81 0.64
including 100.31 107.81 7.50 1.02
GR-10-124 25.00 138.00 113.00 0.34
including 25.00 39.00 14.00 0.81
and including 123.00 138.00 15.00 1.09
including 130.20 131.00 0.80 12.15
GR-10-136 3.00 192.60 189.60 0.32
including 24.00 25.50 1.50 5.60
and including 93.07 153.00 59.93 0.60
including 117.00 120.00 3.00 5.22
GR-10-139 8.85 11.00 2.15 5.67
and 78.00 106.14 28.14 0.41
GR-10-164 15.00 58.00 43.00 0.32
including 40.50 41.00 0.50 7.74
GR-10-177 45.00 118.60 73.60 0.38
including 45.00 50.00 5.00 2.79
including 45.00 46.50 1.50 8.00
GR-10-179 3.00 159.00 156.00 0.61
including 50.75 123.00 72.25 1.25
including 50.75 59.50 8.75 3.43
including 56.00 57.50 1.50 15.90
and including 116.00 123.00 7.00 7.09
including 121.50 123.00 1.50 29.30
GR-10-193 38.40 203.00 164.60 0.31
including 38.40 88.00 49.60 0.36
and including 199.00 203.00 4.00 2.31
including 200.40 201.50 1.10 6.50
GR-11-203 139.00 187.40 48.40 0.31
including 178.00 187.40 9.40 1.17
GR-11-205 4.50 78.00 73.50 0.31
including 40.50 70.50 30.00 0.69
including 40.50 54.50 14.00 1.35
GR-11-207 3.40 78.00 74.60 0.48
including 33.00 61.50 28.50 1.19
including 55.50 61.50 6.00 2.99
including 55.50 57.45 1.95 7.13
GR-11-209 14.50 40.50 26.00 0.31
including 14.50 16.00 1.50 3.84
and 66.00 93.00 27.00 0.32
and overlapping
84.00 97.50 13.50 0.62
including 87.00 88.50 1.50 2.87
GR-11-210 59.50 76.50 17.00 0.30
including 59.50 66.00 6.50 0.60
GR-11-218 3.00 69.00 66.00 0.31
including 17.00 36.00 19.00 0.77
including 17.00 25.00 8.00 1.37
including 17.00 17.50 0.50 9.30