Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Conservative estimate, I think

This uses a fairly high cut off grade, and still shows quite respectable figures. The follow-up report will probably show a much larger inferred figure, from a large tonnage at low grades. We know that is what this is all about, a big voume of low grade near surface ore.

The market seems to like the report, certainly. Up to 18c quickly.

Share
New Message
Please login to post a reply