So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Production soon

Ok, took the 32,000 oz figure from a poster on another board. From the GBB website, they "expect to produce 73,585 ozs over 3 years at a cash cost of US$797 per oz". Which would be somewhat less than 32,000 oz/yr. Divided by 3 = 24,528oz/yr.

So, something like 20 to 25% less than 32,000 oz in that first year, perhaps, still a good amount of revenue.