Pretty much it has been said that the partners that will be given the utmost consideration are those that will be able to take the project thru Phase by phase or for specific projects such as to address a full program would a preliminary state of production to production of the Suspected Copper leachable prospect/s, which could be one or more aeras in the Hay Mountain site, with 35 sq miles suspect there is a lot of room for ACTION at HM.
https://www.youtube.com/watch?v=f9gg2gX-ZrA