We do not need 5-10 million right now. We were told a year or two ago that we have 10-12 target holes. The estimated average cost to drill was $200,000 each. We need 2-3 million. The 10 million figure came recently from JB on a “new fundraising “ campaign. SP will go up on drilling news and then with each hole we drill it would continue to get a bump (assuming good assay results). I would think we would be able to get a partner for Hay Mountain at that point to take us the rest of the way.