..... I have wondered:
In light of the deduced HM mineralization being overlain by didficult-to-drill, 'marbelized' (?) material, has the possibility of a lower cost blast-to-breech-master hole - and angle drill scheme been investigated for feasibility and cost analysis.
Just a layman's out-of-the box wondering.