I also want to point out that we don't know whether or not the different phases of the drilling program will be reported together or separately. That is, the lab could be instructed to report the Hay Mountain results when available or to hold them for reporting together with the RRC results. If the latter, we have to wait a while longer.
As a public company, LBSR cannot sit on lab reports once in hand. They have to be shared in a PR.