The World’s Next Nickel Sulphide Camp?

Free
Message: Re: New Nickel Discovery Within the Fossilik Norite at Maniitsoq Project-Table1

Hi RockLicker,

Just noticed that Table 1 looks strange. It would be fantastic to have 56m @ 4.53% Ni, but this should be 4.53m@1.06%Ni (got shifted by one column). Must be due to the posting copy and paste glitches.

Table 1: MQ-13-018 significant assays (The "incl. rows" should be shifted to the left by one column)

From
(m)
To
(m)
Length
(m)
Ni
(%)
Cu
(%)
Co
(%)
Pt
(g/t)
Pd
(g/t)
Au
(g/t)
Total
PGM*
S
(%)
Zone 1 40.24 72.43 32.19 0.59 0.18 0.02 0.10 0.03 0.08 0.21 2.94
Incl. 51.75 56.28 4.53 1.06 0.23 0.04 0.20 0.04 0.09 0.33 5.97
Zone 2 94.00 120.00 26.00 0.24 0.11 0.01 0.07 0.02 0.07 0.16 1.31
incl. 108.00 117.00 9.00 0.42 0.15 0.02 0.14 0.03 0.10 0.27 2.38
Zone 3 173.29 182.00 8.71 0.26 0.15 0.01 0.04 0.01 0.07 0.12 1.04

Note: all lengths are core lengths, true widths are unknown.

The results were shifted, hence the results should be checked with the source, link below.

http://www.northamericannickel.com/news/news-details/2013/North-American-Nickel-Inc-New-Nickel-Discovery-Within-the-Fossilik-Norite-at-Maniitsoq-Project-Drill-Program-Ends-Assays-Pending-for-Imiak-Hill-Conduit-Complex/default.aspx

goldhunter

Share
New Message
Please login to post a reply