Spoke to Dave P this AM.
The 350 meter MMI sampling line was directly across the A1 anomoly on page 2 of this fact sheet.
Stong indication that we have a second structure in the area with the confirmation of the MMI results.
Ground loop geo will be done soon to better define the drill target.....
Drill will start end of the month or so on the Tamarac property... 6 to 8 holes for the Mantis JV, then it will be moved to the A1 target.
http://www.probemines.com/i/pdf/McFa...
.