Solid foundations. New horizons.

Free
Message: Probe President David Palmer on Ontario gold assays of 10.9 g/t over 6.6m
Probe President David Palmer on Ontario gold assays of 10.9 g/t over 6.6m

Probe Mines Limited TSXV:PRB announced drill results from its Borden Lake gold project near Chapleau, Ontario. Assays include:

1 g/t gold over 4 metres

2.3 g/t over 17.7 metres (including 9.2 g/t over 3.7 metres)

0.6 g/t over 100.5 metres (including 1.2 g/t over 17.5 metres)

10.9 g/t over 6.6 metres (including 57 g/t over 1 metre)

0.6 g/t over 93.9 metres

0.8 g/t over 129.9 metres (including 1.8 g/t over 38.3 metres)

0.6 g/t over 113 metres

0.6 g/t over 130 metres.

A drill has been mobilized to test geophysical anomalies identified north of the Borden Lake gold zone by induced-polarization survey. The 100-line-kilometre survey is expected to be completed over the next two weeks. Drilling is expected to start this week.

Read the interview.
Share
New Message
Please login to post a reply