While we sit and ponder has anyone stopped to consider the borehole sequence here? The big hit was in borehole 256 on section 1200m SE....haha so things are getting very interesting way down there in the south east corner. But then look at section 1300m SE. It's cut short and doesn't have the third drill set on the north end (where the high grade should be). Meanwhile, Probe has since reported up to borehole 293? and none of these go further to the southeast. Several of these further backfill on lines 1000 SE (boreholes 267 and 293) and 1100 SE (boreholes 275 and 281) but nothing further to the southeast. The answer is painfully obvious; Line 1300SE must be butted up against the property boundary.....that thin claim wedge about 200m in width that separates from Borden Lake arm (which Probe owns). So presumably right now its all about the 200m wedge. Kind of like '12 foot Davis' of Yukon gold rush fame; got rich after discovering a 12' gap between to adjacent claims on one of the bonanza creeks.
The Mookster