Not sure if anybody can answer this, but do we know if that 51m x 10gm/tn hole was drilled in relation to the neighboring property boundary?
Wondering because from the chart below, it looks like they were drilling in the direction in toward the main zone rather than further SE away from main zone. Did they do this because it's good practice, or do they have no more room to drill in the other direction?
Is this how I'm reading it?
Higher-Grade Zone Intercepts
DDH |
Section |
From (m) |
To (m) |
Width (m) |
Au (g/t) |
BL12-215 |
1000m SE |
321.4 |
355.4 |
34.0 |
1.3 |
|
BL12-340 |
1050m SE |
341.3 |
374 |
32.7 |
1.7 |
|
BL12-233 |
1100m SE |
338.9 |
376 |
37.1 |
1.9 |
|
BL13-362 |
1150m SE |
334.1 |
377 |
42.9 |
3.4 |
|
BL12-256 |
1200m SE |
328 |
379 |
51.0 |
10.3 |
|