Message: Yesterday's presentation

I had some difficulty locating Probe presentaion using the original link (which was for 2014/11/04). So try the following link to see if it would take you directly to Probe presentation by Dave (2014/11/05 at 14:30).

http://www.gowebcasting.com/events/precious-metals-summit-conferences-llc/2014/11/05/probe-mines-limited/play/stream/13144

Some highlights:

- It's labelled November 2014 Presentation (have not checked to see if this is the same in the Sept 2014 Presentattion of Probe website). Presented by Dave on 5 November 2014

- Land acquisition (near the end, around 14 min onward): Saw light at the end of the tunnel. End of 2014? All green area on slide 13 (a pdf copy can be downloaded). There was one question asked by the moderator about the gap in the high-grade deposit. Dave answered: It is the area under the "wedge" which is part of the land under negotiation for acquisition. This area has not been drilled. But the moment the land acquisition has been done (end of 2014?) this area would have top priority in the drilling program.

- Drilling to extend the high grade zone and drilling elsewhere in current land package including East Limb are in the current and 2015 winter drilling program.

- In-fill drilling to convert inferred to indicated.

- Underground operation for high grade zone. Because of the large width (~30m wide) this deposit is suitable for bulk UG mining despite the fact that it's not in the ideal vertical orientation.

Land deal done by end of 2014 or earlier, hopefully.