seems that kxl is using a sage drill at this time here is a portion of his post but going on kxl board is worthed
good night-------------------------------...
The 6th drill is only briefly on loan from Sage because they got ahead of their geologists and couldn’t use it, but our “5th” is down just now so only 5 drills are turning. Basically the story is 5 drills. KXL has been drilling Cote Archie with Alto and results should be out in roughly 2-3 months. Maher compared the exploration effort in size to the McFauld’s Lake activity, and said he thinks of the KXL land package as a pristine, unexplored Val D’or. An inspiring vision.