I have read several inquiries regarding the delay in drill permits and the long awaited results that will come from the drill program.
Does anyone know the status of the Stage 2 Titan 24 Geophysical Survey? In mid June a nr came out stating the fieldwork is completed. They also stated that the results of this survey along with the results of the Stage 1 survey will be used to identify drill targets.
Are the drill permits the delay or are they simply waiting for the results of Stage 2 so that they can determine additional drill targets over the ones pulled from the Stage 1 survey?