Is it just me or does it seem like the drilling is taking alot longer then it should?
http://www.energold.com/s/Surface.asp
Im assuming we would have a simular drill on site as the one on energolds website. This says theY should be able to drill 25m to 30m in a 12 hour shift. I dont believe their drilling 24 hours a day but the math still doesnt add up.
Im terrible at math but I came up with a really low number of .40 meters per hour is what were currently drilling with 2 drills. Somebody please correct me.
I have no problem waiting but it just seems its going awfull slow.
JMO