Welcome To the WIN!!! St. Elias Mines HUB On AGORACOM

Keep in mind, the opinions on this site are for the most part speculation and are not necessarily the opinions of the company WITHOUT PREJUDICE

Free
Message: I think there is a clue as why we didn't hit gold!

"The final objective is to obtain the quantitative information required for the quantitative evaluation of the deposit in a formal feasibility study; the objective is a production decision that leads to a profitable operation."

With regards to what you posted about bulk sampling, Longball, I believe these would be the steps taken after a deposit has been defined by drilling. The purpose is to do metalogical tests to determine recovery rates and such, which would be included in a feasibility study. The feasiblity study takes into account variables like cost of infrastructure and the cost to mine at particular depths vs recoverable grade in order to determine if a deposit is feasible to mine. Like it says, it's "the final objective". This is what you do after you define a deposit in order to de-risk the project and turn your resource into reserves.

The problem is SLI hasn't defined a deposit yet. And while it's possible they can bulk sample at profit until the cows come home, bulk sampling will not define a deposit.

Share
New Message
Please login to post a reply