Welcome To the WIN!!! St. Elias Mines HUB On AGORACOM

Keep in mind, the opinions on this site are for the most part speculation and are not necessarily the opinions of the company WITHOUT PREJUDICE

Free
Message: Chance F

Again, why were the SLI shareholders not informed of this drop in option? And, wasn,t there immediate work being done last year starting in July, where are the results from this?

It doesn,t take the brains of an investigative unit to see that there is something wrong with our whole company.

I am also initially looking at some recent arial photos of the Tesoro, it may appear that some of the trenching reported on, was in an area where we had considerable widths of mineralization, around 45 m.

Also, if going by the acuweather images, the trenching is done on the NNE side of the property, and not around the Zona Central and Zona Este areas as Lori says in this literature below.

"A second program of trenching, utilizing Stage 1 and 2 Titan24 geophysical and remote sensing data, was initiated in the spring of 2011. As at May 31, 2011, 15 trenches totalling 1,200 linear metres have been completed with 215 samples collected over 5m sample intervals from the trenches at the Tesoro Project. The trenches were completed by a backhoe and a track-mounted excavator at Zona Central (Main Structural Corridor) and Zona Este (Parallel Structural Corridor)."

http://agoracom.com/ir/steliasmines/forums/discussion/topics/543272-does-this-look-like-a-property-with-nothing/?message_id=1712983

Share
New Message
Please login to post a reply