Going back in time a little, looking @ old news. Continually looking, as many others as well. It was always a mystery to me, on the original NR of drill results from Jan 10, 2012. Three holes always stood out, IMO, and those would be holes 9, 10, & 11
Of the original 4374 M of drilling reported, these three holes accounted for 37% of the drilling.
Holes 9 & 10 on each side of the anomally on approx Line 5250, and Hole 11 inside the corridor also close to Line 5250.
All three holes basically accounted for nothing. Hard to argue, I guess?
It would sure be nice to clarify & verify, the information, mistakes do happen, as we all saw on April 17, 2013 with the NR & clarification on the depth of Hole # 8, which was reported as 330M but was actually 233M?