I haven't yet heard back on my email presume it will be the same.
April 28th:
The fourth drill, exploring an area located approximately 12 kilometres to the southwest of the Eagle One and Blackbird areas completed an additional two holes (NOT-09-146 and NOT-09-150) totalling 456 metres bringing the total number of holes drilled into this area to five totalling 1,360 metres. Assays are pending for these five holes. Drilling in this area has been temporarily suspended for the break up period.
I think our response should be that 4- 5 months for the Noront team to meet and produce results from these assays is an inordinate period of time. Could we please have a target date for release of this info.