Free
Message: Xora claims/drilling...lo... ahead

Xora claims/drilling...lo... ahead

posted on Apr 20, 2010 01:14PM

From NR Jan 25

"In conjunction with the mill being placed into production, an exploration plan is being developed for the Xora claim which will be based on the 43-101-compliant results reported on numerous vein structures within the Xora claim group (see March 17, 2009, press release in Stockwatch). Some highlights from that sampling program included gold consistently between 0.25 gram per tonne (g/t) to 0.8 g/t with highs of four g/t to seven g/t while silver showed a range of 250 g/t to 600 g/t with highs of 980 g/t to 1,900 g/t. No known diamond drilling has occurred on any of the aforementioned vein structures, which are open at depth and on strike. Logistics and geophysical programs are presently being planned for the impending drill program on the Xora claim. "

THere is some pretty interesting stuff on the UC website with maps results from sampling etc. Depending on drilling which I gather is planned for this spring..there is the potential that the Xora grades could be higher than the tailings...wouldn't that be an interesting scenario? All this is unknown until we drill but it could be an important event for UC. Just something to think about while we wait for news from La Yesca...and JIM keeps buying more shares. I know Hoov and Sudbury commented about this area from their visit..maybe they have something more to add.maybe not? Meanwhile a visit to the UC website..might help build some DD.

Share
New Message
Please login to post a reply