Finally - The Real Rush Is On
posted on
Dec 05, 2010 11:22AM
Sure hope the Upped Through Put down South will be sufficient to cover operating costs.
With that said, and out of the way, it is good to see the REAL Focus has returned.
Good job saving that mess down South, but time now to get to what will make the MEANINGFUL difference.
Back to the North!
Given what was underdtood and demonstrated to be basically correct by those drilling programs back in 2002 - 2007 it is long past due to punch a few more Drill Holes into the Cu and Zn to demonstrate the initial understanding WAY BACK THEN was correct and remains correct.
Can only give more stimulus to getting construction underway as quickly as can be designed, engineered, and financed.
Waiting for the Slurry (LOL!) of Real Physical Activity to actually get going.
Sure looks like the Waiting Game is coming to a close.
Wonder how many Holes can be punched before the AGM? With two drills turning, how many more?
Plenty of Paper Slurry having been accomplished already, and in relatively record time, should be ready now for the 'On the Ground' Slurry to get under way.
No Pipe dreams here! (LOL, LOL, LOL!)
Old Joe