Lawrence should have listened to the conference call about the 4 yr clause.
I found this part disturbing:
"Teck might argue, to buy more time, that the feasibility study is not complete, in that there are unresolved issues. "
Is this possible? Teck has been looking over our shoulder during the whole process. I find that hard to believe that they'd suddenly say "nah, nah, you need 10 more holes and another FS".
Anyone heard a good reason as to how and why we missed 171 MILLION tonnes of inferred in Liard zone - the same zone that was within the 2008 PFS mine plan plus 2 RE block models following? That 171M tonnes is haunting me.
For some homework do some math:
171,000,000 Tonnes X 1m³/2.65 tonnes of rock = "X" m³ of inferred rock
The interior volume of BC place stadium in Vancouver is 2,644,800 m³
(divide "X" by BC place volume...)