Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: Re: Timeline for Finish line.
3
Jan 17, 2013 08:27AM
3
Jan 17, 2013 09:35AM
6
Jan 17, 2013 09:44AM

Have a question for you Vette, If we deliver BFS, and the Laird shares are transferred, what motivation would there be for Teck to not take the full 120 days, we have to continue as "business as usual". That would mean we have to come up with 2013 drill plan.

I think Teck taking 75% doesn't make sense and that they need to take us out, so an offer need to be accepted before the 120 days is up or Teck will be forced to back in or lose everything. Read this:

http://agoracom.com/ir/CopperFoxMetals/forums/discussion/topics/556920-why-a-75-back-in-doesn-t-make-sense/messages/1752710

21
Jan 17, 2013 09:57AM
7
Jan 17, 2013 10:01AM
2
Jan 17, 2013 11:37AM
3
Jan 17, 2013 11:54AM
1
Jan 17, 2013 11:56AM
9
Jan 17, 2013 11:57AM
7
Jan 17, 2013 12:02PM
8
Jan 17, 2013 12:08PM
Share
New Message
Please login to post a reply