Re: "Sunday research"
in response to
by
posted on
Feb 24, 2013 11:15PM
CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
Was the EA delayed since the pit plan changed? I seem to recall something along that line, meaning they needed the feasibility study prior to being able to file it?