Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: A little Piece of the Puzzle....??? ;)

I was chatting with a member on PM about the Oil price/economy and About Teck's Forth Hills project.... it made me curious about it and and wanted to know whats going on with this..

I ended up doing some research on cost production, locations,,,etc and found that very interesting PDF from TECK.

https://www.teck.com/res/tc/documents/_ces_portal_meta/downloads/investors/ir%20presentations/2013/fort%20hills%20conference%20call%20presentation%20oct%2031.pdf

I scrolled down until I founded a beautiful map on slide 22 about (GROWING TAKE-AWAY CAPACITY IN NORTH AMERICAN PIPELINES)

uuuhmmmm....?!

I Suprisingly saw a pipeline route in Blue pointing to (KITIMAT). If you go at the Legend down bellow....The blue Line represent: (Under Construction or expected to start construction soon)

Interresting...

But then...Where's KITIMAT...??? Looks pretty near to our location of interest..

A Little Google map search made me spot Kitimat on HWY37 called (Kitimat-Cassiar HWY) ...At Exactly 261KM from Smithers,Galore Creek. (I tried to target Shaft Creek but I wasn't able)

The size of that Pipeline is said to be: 525-850 KBPD.

THE TIMMING: 2019+

I think I may got a little piece of a puzzle... ;)

Share
New Message
Please login to post a reply