I was chatting with a member on PM about the Oil price/economy and About Teck's Forth Hills project.... it made me curious about it and and wanted to know whats going on with this..
I ended up doing some research on cost production, locations,,,etc and found that very interesting PDF from TECK.
https://www.teck.com/res/tc/documents/_ces_portal_meta/downloads/investors/ir%20presentations/2013/fort%20hills%20conference%20call%20presentation%20oct%2031.pdf
I scrolled down until I founded a beautiful map on slide 22 about (GROWING TAKE-AWAY CAPACITY IN NORTH AMERICAN PIPELINES)
uuuhmmmm....?!
I Suprisingly saw a pipeline route in Blue pointing to (KITIMAT). If you go at the Legend down bellow....The blue Line represent: (Under Construction or expected to start construction soon)
Interresting...
But then...Where's KITIMAT...??? Looks pretty near to our location of interest..
A Little Google map search made me spot Kitimat on HWY37 called (Kitimat-Cassiar HWY) ...At Exactly 261KM from Smithers,Galore Creek. (I tried to target Shaft Creek but I wasn't able)
The size of that Pipeline is said to be: 525-850 KBPD.
THE TIMMING: 2019+
I think I may got a little piece of a puzzle... ;)