The results of the 2023 (and 2022) studies are what we are waiting for. Both relate to Meta (metallurgical) results from drill cores from both years.
Drill results are important on their own, confirming/expanding grades and intervals.
The metallurgical results apply to tests from selected/all cores where they look at metal recoveries obtained from different digestion methods.
Grades and metal recoveries are key to determining value to the project. The results can be plugged into existing models that will update the project economics, potentially increasing the value of SC from $845M to somewhere around $2B as has been speculated here on this forum.
K