Developing the Kasala Project In The DRC

Latest assay results have confirmed that copper mineralization has a minimum strike length of approximately 800 metres and a width of approximately 250 metres

Free
El Nino Ventures Inc Photo Gallery


The AGORACOM Photo Gallery is Now Live!

The Photo Gallery can be used to host photos from conferences, charts, maps, headquarters, operations and much more.

To start uploading photos, simply click on the “edit” link at the top right hand side of this box.

Photos can be uploaded by those with a rank of Treasurer and up.