Welcome to the Gainey Capital Hub On AGORACOM

An Emerging Gold And Silver Company In An Established Mining District

Free
Gainey Capital Corp Profile

El Colomo

El Colomo is a highly prospective property with district-scale gold-silver potential. High-grade and bulk tonnage targets have already been identified through prior exploration and there are strong indications of continuity between La Higuerita, La Nueva Victoria and Las Minitas (at least 2 km in strike length). Gainey has engaged Minera Cascabel, led by renowned geologist Peter Megaw, to run the exploration work at El Colomo.

Highlights

  • 18,766 hectares (46,372 acres) of contiguous Mineral Concession, including El Colomo Dome
  • High–Grade target potential exemplified by La Nueva Victoria vein. Historic drilling of this vein system included an intercept of 7.5 mts @ 13.64 g/t Au & 899 g/t Ag (31.6 g/t AuEq).  Note that the historic drilling, sampling and data management was not supervised by a Qualified Person and must be considered non-NI 43-101-compliant.   *Source: Valles Mendoza, Golden Anvil Internal Company Report, 2009
  • Intrusive-hosted bulk–tonnage target potential exemplified by the intrusive-hosted La Higuerita zone. The average grade of the surface of an exposure of mineralized felsic intrusion at La Higuerita was calculated by previous owner Golden Anvil using the kriging method on results from 69 trench and surface samples representing an area 1000 m long X 80 m wide as follows:  0.93 g/t Au, 22 g/t Ag (1.37 g/t Au-Eq)**. The sampling, data management and grade calculation were not designed nor supervised by a Qualified Person and are not NI 43-101 compliant.  The calculation should not be relied upon but is discussed here to illustrate the geologic potential for bulk-tonnage targets on the property. Note that this mineralized zone is open along strike and at depth. **Source: Bravo-Nieto, Golden Anvil Internal Company Report, 1997    
  • 97% of this 192 sq km property has not been explored using modern concepts & technology.  All 20 mineralized zones identified to date are in the central portion of the property, within a 1.5 km radius (3% of property).  Remainder of the property has similar geology, alteration and geochemistry, suggesting the potential for a very large, gold-rich mining district
  • El Colomo Dome has geological similarities with domes in nearby productive mineral districts in the State of Durango, such as Bacis, Tayolita-San Dimas and Pueblo Nuevo   

 

 

 

La Higuerita

Previous Work has identified possible Bulk-Tonnage Resource Potential at La Higuerita

The average grade of the surface of an exposure of mineralized felsic intrusion at La Higuerita was calculated by previous owner Golden Anvil using the kriging method on results from 69 trench and surface samples representing an area 1000 m long X 80 m wide as follows*:

This mineralized zone is open at depth and along strike.

The sampling, data management and grade calculation were not designed nor supervised by a Qualified Person and are not NI 43-101 compliant.  The calculation should not be relied upon but is discussed here to illustrate the geologic potential for bulk-tonnage targets on the property.

WEIGHTED AVERAGE GRADE * (FROM 69 SAMPLES)
0.93 Au g/t
22.00 Ag g/t
1.37 Au-Eq g/t
0.04 Au-Eq oz/t
*Calculations were ‘weighted’ by sample lengthSource: 1997, internal Golden Anvil report by Ing. Jose Bravo Nieto titled “Proyecto Auroargentifero El Colomo” 
 

La Nueva Victoria

Vertical dimensions of ore bodies in analogous vein systems in nearby districts can be at least 600 meters, and commonly have strike lengths of 300 - 1000+ meters.

 

 

Mill/Processing Plant

Gainey Capital’s recently upgraded 300 Tonnes/day mill is located in the prolific gold/silver Sierra Madre region of Western Mexico and is the only one in the region to include a gravimetric/flotation processing center, which optimizes gold and silver recovery rates.

The mill is run by Mexico Operations Manager, George Cantua, who previously supervised Barrick Gold’s 20,000-tpd mill in the Dominican Republic. The infrastructure is in place to support a second 300 tpd ball mill, ramping up through-put capacity to 600 tpd at such point as the company is ready to expand further.

The Mill has been upgraded again in 2018 (please see the Company's news release from May 10th, 2018) as Gainey continues to sample mineralized material in the area for potential toll processing operations.

Fully-Operational Plant to Provide Early Toll-Processing Revenue

Historical Operation

 
Rated Capacity 300 tons /day
Concentrate Production 66 tons /month
Ore Head Grade 5.78 g/t Au-Eq
Final Recovery 68.7%
Production (Au) 463 oz Au /month
Production (Ag) 10,919 oz Ag /month
Production (Au-Eq) 712 oz Au-Eq /month

Facility Specification

 

 

24" Jaw Crusher + Roller 80 tonnes/hr
7’ x 10’ Ball Mill 13 tons/hr
3’ x 7’ Vibradrum (re-grind) 5 tons/hr
Gravity Concentrator 10-80 tons/hr
4 Vertical Flotation Cells 32 tons/hr
4 Horizontal Flotation Cells 16 tons/hr
Last changed at 14-Aug-2019 11:26PM by