Massive Black Horse Chromite Discovery

Black Horse deposit has an Inferred Resource Now 85.9 Million Tonnes @ 34.5%

Free
Message: Grand Chief pushing power plan for Ring of Fire

MB, interesting point re KWG using natural gas processing our chromite, however, KWG using natural gas instead of electricity is unique in processing chromite and the savings we have touted by using natural gas must be the paramount concern for KWG. I am sure a lot of electricity will be required in the whole ROF mining area, so there should be a very considerable need for a lot of power. With all the work KWG has been doing with our cost saving way by using natural gas to move the chromite to market, this method of smelting will hopefully have other users coming onboard and thus, hopefully, helping KWG dramatically increase our current pathetic share price. rj

Share
New Message
Please login to post a reply