I'm harping on this because it could enlarge the size of deposit even if at lower grade. Here is the visual detail from earlier news release.
Hole NOT-07-28 was drilled at local grid collar location 51+74E at 10+69N with an initial azimuth of 270 degrees, being the same location as hole NOT-07-26 that was earlier abandoned. The dip was reset at -51 degrees to go around casing and rod lost in hole 26. After 14.8 meters of overburden and limestone this hole entered granodiorite until 128.1 meters when olivine gabbro was encountered until 140.1 meters. Between 140.1 and 169 meters, peridotite was encountered, followed by mineralized peridotite to 175 meters. Net textured mineralized peridotite was then encountered and the hole remained in this rock unit until 202 meters, the hole has been suspended for season ending break. This hole will be completed in early 2008
OK, now Dick told me a week ago that they restarted that drill upon return to drilling and it did continue in mineralized ore. Some savy forum members told me that given previous drills we could expect this to be maximum of 10 to 20 meters more. I told Dick about this guess and he said 'MORE'. Even 30 meters adds to resources and 50 or more really adds to it. Of course assay results will take another week or two even with new laboratory fast tracking things.