Cabo to drill a minimum 6,000 meters for Cadillac Ventures and Noront Resources atBurnt HillLast Updated Monday, 22 October 2007North Vancouver, BC &; Cabo Drilling Corp (TSX-V: CBE);Cabo; or the;Company;) Atlantic Division has been awarded a contract to drill a minimum 6,000 meters for CadillacVentures Inc. (CNQ: CDEX) at their historic Burnt Hill tungsten & molybdenum project near Fredericton, NewBrunswick. The Burnt Hill Project is a joint venture between Cadillac Ventures Inc. and Noront Resources Inc. (TSX-V:NOT). (See Cadillac news release dated April 4 and Sept. 20, 2007). The Company is operating two drills on site with the objective of twinning historic holes in order to bring the Burnt Hillhistorical data to a NI 43-101 compliant level to enable a current resource calculation. Cadillac will also be drilling anumber of new holes recommended by P&E Engineering of Brampton, Ontario in an effort to increase the presentresource and explore some of their newly staked property. An airborne geophysical survey has been booked and will be conducted over the entire land package by the beginning of November.
Notster