On February 25th they announced Eagle 2 has landed. They had 3 holes finished and hole 4 (number 8 on their list) was at 127M. Now that hole went down to 336M which probably took another 2 days or so. So from the end of February to April 2nd, they drilled 8 holes to completion. Actually, the last hole indicated depth of sulphide to 190M but hole depth was not in the report so I am assuming, they were still drilling it at the time of the report. So anyways they should of drilled another 8 holes with which they had a better hit/miss ratio according to NN at the luncheon. So they must of hit at least 6 times. The thing I like the most is that E2 actually has 2 mineralized bodies that can both be very significant!!