HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Follow=up --> My post from Nov 4

Another 4 weeks later and still nothing to report....all we get is an interview termed "update" with no updates.....enough is enough

My prior post is as follows from 4 weeks ago...some comments added

Previous post (November 4) with respect to news we are waiting on

Then I followed up on November 21 -- some items out

Now; going on another 3 weeks

From October 6 news release with respect to AT-12, holes 11 & 12 encountered 46.7 metres and 43.9 metres of mineralization respectively. Also, four new holes were drilled from September 15, to October 6. Therefore, we should have further visuals if not more assays by now....that's over 13 weeks now

From October 10 news release with respect to Eagle 2, assays pending on 6 holes. They also discuss the drilling; one drill at Blackbird 2; one drill at AT-12; one drill at Eagle 1. Are they not encountering any mineralization at Eagle one? --> news since that Oct 6 post on new deposit under Eagle one....now 8 weeks later with no assay results or further visuals

From October 16 news release with respect to Blackbirds 1 & 2, assays pending on 4 holes at Blackbird 1 (52, 58, 60 & 62). Also, no assays recieved yet on Blackbird 2 (minimum of 3 holes). This news release further describes the drilling of Blackbird 2 as 100 metre stepouts between Blackbird 1 & 2. News of 10's of metres of massive chromite on 100's of metres of step outs is better than no news....and what do we get; a news blackout?

From October 21 news release with respect to Windfall, assays pending for W-3 Zone (the most important zone). The news release also discusses bulk sampling of several zones, other mineralized structures encountered and consideration given to underground and surface drilling. At a time when gold appears to be making a move, news of gold would help to give us a lift.....Seems they just don't want to talk about Windfall; maybe if they just avoid this issue, people will forget we still didn't get any results from the W-3 area....

Now...will we see some positive news to increase shareholder value before options are granted or will we get the news only afterwards. This will be quite telling.....--> news since that Oct 6 post on PP and options....at the rate they are burning cash, we may see another PP before we get any further news

Comments: Nov 21/08

We are now another 2 weeks along.....still much news pending...now we can add to that... what else they are finding at eagle one.... and the closing of the PP

I can understand the duration for assays on the chromite deposit....but, is it normal to take a month to get assay results for gold at W-3 zone? is it normal to take 6 weeks for assay results for nickel and copper and PGM's? (AT-12)

Maybe just a bit impatient

New Comments: December 9

PP now closed......was being used as an excuse for the news blackout....what is the excuse now? I find it hard to believe that none of the assays are back or that there is no follow up to the new deposit under eagle one....no assays on the gold at W-3....simply.......amazing

Still in the dark....

Comments today: January 9

Now, 4 weeks later and still in the dark....absolutely nothing except that interview...that stall tactic....with the so called updates....

I keep thinking news has to be coming next week, and for many weeks now, I've been wrong

I hate being wrong

Share
New Message
Please login to post a reply