"
Four drills continue to delineate the Eagle's Nest along strike, down dip and to greater depths due to previously announced drilling capacity. Current drilling has traced portions of the Eagle's Nest deposit more than 100 metres along strike and indicates widths up to 50 metres. Results from the drilling will be released as they become available. "
If that is the case Glorieux then why did they now just say 50 and 100m widths. Why did they word it like ti is 2 different measurements.
Along the strike is surface 100m and width is deep 50m.. Am i missing something?
Or did they word it wrong in the NR and when you called them that is what they told you? Thanx as always.. TTY