HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Why did we get SNC

Why did we get SNC

posted on Nov 02, 2009 02:36PM

I wonder if this has anything to do with the lobby group that NOT signed up to go after some of the stimulus/government monies for infastructure.

Not sure if this was posted.

Mr. Semple's 27-year career in the mining industry has focused on feasibility studies, project development and operations of precious and base metals deposits. Much of his time was spent with Kilborn (later SNC-Lavalin) where he was involved in all aspects of global project development from initial studies through to construction and operations. Mr. Semple held various positions including Vice President and General Manager at SNC Lavalin Engineers and Constructors where he was responsible for numerous projects including Voisey's Bay and Diavik. Recently, Mr. Semple was Vice President of Projects for Western Goldfields Inc, and was responsible for managing the feasibility study and engineering/construction required to restart the Mesquite Mine, a project that was completed ahead of schedule and on budget. Mr. Semple holds a Bachelor of Applied Science from Queen's University and is a professional engineer.

Tks RR

Share
New Message
Please login to post a reply