And Now For Something Completely Different
posted on
Nov 12, 2009 10:16PM
NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)
It is understandable that most dialogue of late has centered around the topical issue of merger/consolidation.
Taking a back seat amongst the majority of these discussions is the "bread & butter" of each ROF player, namely exploration and ultimately results.
Occasionally, I do enjoy going back and revisiting older news releases. It is a good exercise in that it is an escape from the day to day stuff here and at the same time, it reminds me why I am here. (and what might be forthcoming)
Below is a recap of highlights of NOT N/R's from the last few months:
21-May |
Drilling resumed at Eagle One - 5 holes (2,286 mrs) June 29 N/R |
29-Jun |
NOT-09-049 visuals - B: 269.54 - 510.69 mtrs & C: 749.7 - 945.67 mtrs |
29-Jun |
NOT-08-045 - deepened in 2009 - 46.12 mtrs Ni, Cu sulphides |
29-Jun |
92 holes complete on the BB deposit - 25,477 mtrs of drilling |
29-Jun |
Micon Int. contracted to complete NI 43-101 on BB 1 & 2 deposits |
29-Jun |
3 drills turning - Eagle One, AT12 and Oval Lake |
29-Jun |
No drilling on Eagle 2 since 2008 |
29-Jun |
BHEM on several deeper holes at E2 has been completed |
29-Jun |
19 holes completed (4669.5 mtrs) on Northern Claim block - assays pending |
6-Jul |
Assays for 30 holes from BB 1 & 2 released (30 holes outstanding) |
6-Jul |
NI 43-101 expected to be complete in fourth quarter 2009 |
6-Jul |
Total 154 holes (52,344 mtrs) drilling at the BB's |
6-Jul |
3 drills turning - Eagle One, AT12 and Northern claim area |
5-Aug |
Assay results for hole NOT-09-049 |
5-Aug |
3 drills testing the extent of the mineraization below E1A |
5-Aug |
All drilling is utilizing directional drilling tools |
5-Aug |
All completed holes are surveyed using down-hole electromagnetics (EM) |
31-Aug |
Final 30 holes of BB assays |
31-Aug |
41 holes re-sampled to allow for more accurate modelling of the deposit |
15-Sep |
Assays for 9 holes at Eagles nest (NOT-09-51 - NOT-09-58) |
15-Sep |
3 drills testing mineralization to a vertical depth of 1,000 mtrs |
15-Sep |
1 recently added drill with full time directional control capable of 1,500 vertical |
15-Sep |
Directional drilling equipment onsite - more efficient and less time consuming |
15-Sep |
All drill holes are currently evaluated using Bore Hole geophysics (BHEM) |
15-Oct |
Assays for 9 holes at Eagles Nest (NOT-09-59 - NOT-09-68) minus 64 |
15-Oct |
Assays for Pt and Pd incomplete |
15-Oct |
3 drills testing mineralization to a vertical depth of 1,000 mtrs |
15-Oct |
1 drill added pre-Sept.15 testing mineralization up to 1,500 vertical mtrs |
15-Oct |
1 recently added drill with full time directional control capable of 1,500 vertical |
20-Oct |
Assays including PT and PD released for holes NOT-09-59 - NOT-09-68 |
Much information can be gleaned from such an exercise. Here are a few from my perspective:
-assays have been provided for roughly 20 holes that have been drilled in the last 5 ½ months. (what hole do you figure we are on now? – I would love to hear a few educated guesses)
-the first deep drill was added before Sept. 15/09 – almost 2 months ago - by virtue of BHEM being utilized on all drilled holes…
-There has not been any meaningful updates for approximately 1 month but in light of the current going ons, I am not surprised.
I would welcome any meaningful insights as to the above.
While revisiting some of the recent releases, it was thought provoking to see some of the highlights of each release:
Sept. 15/09
Oct. 15/09
Thus far, Noront’s results appear to be second to none in the ROF. I look forward to seeing what recent exploration activity reveals and understand that I will see it when they are ready for me to see it.
Cheers,
Milsy1