HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Ring of Fire Railway Engineers Presentation...for those that haven't seen this

Ring of Fire Railway Engineers Presentation...for those that haven't seen this

posted on Mar 15, 2010 08:02AM

This was posted by Kelsee on the Spider Hub....takes a few seconds to download

posted on Mar 10, 10 11:12PM

… this presentation was made by Kwg. and Cliffs Natural Res. for the Municipality of Greenstone and goes into a lot of depth, very descriptive and accurate as to what has been going on in the planning stages of the actual chromite mine, and the proposed railway routes…

http://www.greenstone.ca/Portals/0/Municipal_Matters/Canada_Chrome_Railroad_Greenstone_Presentation_2-18-10.pdf

… okay, so if the above link doesn’t work for you, try clicking on this link below, once you open this link, click on “Ring of Fire Railway Engineers Presentation”…

http://www.greenstone.ca/MunicipalMatters.aspx

… kelsee

Share
New Message
Please login to post a reply