HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Second drill(2000m) ready to go???

Second drill(2000m) ready to go???

posted on Apr 08, 2010 06:04PM

"The Company plans to operate five drills during the spring / summer program. The first of two drills
capable of drilling to depths of 2,000 metres (vertical) from surface has arrived and is being
assembled. The second drill is expected to arrive within the next seven to ten days."

Assembled and ready to go by Monday,maybe...

Share
New Message
Please login to post a reply