From the Mar 30 NR we know that 2000m drill #1 was on site and being assembled. 200m Drill #2 was 7 to 10 days away.
Question 1. How long does it take to assemble one of those..
From Discussions in the past we have sort of came up with a number of at best 40m/day to drill.
Question # 2. Is that 24 hours drilling or 8 or 12?
We know from the Investor Power Point that they are drilling staring in hole number 49. This hole was down to aprox 1200m already which would leave about 800m to get to 2000m(My math skills are outstanding).
Question # 3. How long does it take to prep then ship 800m of cores to the lab.
Question # 4 . How long would it take to assay those cores?
From drawings in the past the plan was to drill 2 holes along side the deposit 2000m down and then use those holes to angle in at any point.
Question # 5. Would it be fair to assume that 2000m Drill # 2 is drilling one of those holes.
Sorry if this is old stuff just trying to get somethign to talk about for all of us to look forward to.. TTY