HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: found something of interest

Can someone tell me if any results came back yet from 2010 drilling at eagles nest or AT12?

I didn't see any, and drilling had started at these 2 locations before blockade or after without notice.

APRIL 23 McFaulds Lake NI 43 101 Technical Report on website

Table 1-3: Summary of Diamond Drilling Listed by Year for Each Deposit/Occurrence

page 6

Project 2007 2008 2009 2010 (March 9) Total Drilled (m) Total Drill Holes

Eagle's Nest 29 17 43 3 38,661.1 92

AT12 0 19 12 1 10,708.9 32

3 holes drilled at eagles nest up to march 9 2010 and 1 at at12

page 6

Project 2007 2008 2009 2010 (March 9) Total Drilled (m) Total Drill Holes

Eagle's Nest 29 17 43 3 38,661.1 92

AT12 0 19 12 1 10,708.9 32

3 holes drilled at eagles nest up to march 9 2010 and 1 at at12

page 6

Project 2007 2008 2009 2010 (March 9) Total Drilled (m) Total Drill Holes

Eagle's Nest 29 17 43 3 38,661.1 92

AT12 0 19 12 1 10,708.9 32

3 holes drilled at eagles nest up to march 9 2010 and 1 at at12

Eagle's Nest 29 17 43 3 38,661.1 92

AT12 0 19 12 1 10,708.9 32

3 holes drilled at eagles nest up to march 9 2010 and 1 at at12

Share
New Message
Please login to post a reply